Space Solutions

Nikkei Panel System Design and Installation Capabilities

Create, think, conceptualize.
Our spatial engineering capabilities help create functional spaces.

Space Engineering by interdivisonal cooperation of 5 departments

We handle everything in-house including development, sales, design, manufacturing, and construction.
Our greatest strength is space creation backed by manufacturing and engineering functionality.

R&D

We not only develop new panel products, but also improve existing products.
At Nikkei Panel Systems, we engage in planning and research on a daily basis to meet the needs of customers identified in the five areas noted above.

Sales

We offer the best possible solutions to customer issues, coordinating the entire process until construction is complete.

Design

We consider panel combinations and installation methods that match each space.
AutoCAD, BIM, and other digital technology-driven designs help promote DX.

Manufacturing

Production planning, manufacturing process management, etc., are handled by different departments to support the manufacturing foundation.
Nikkei Panel operates three factories so that we can provide a stable supply of products across the nation.

Installation

Our staff manages the process until construction is complete to ensure that you receive the quality in the time frame you need.
Work covers a wide range of tasks, including ensuring construction site safety and progress management so that the work can proceed smoothly.

Solid Track Record of Large-scale Projects

Toyosu Market uses our insulating panels to maintain strict temperature control.

Opened in 2018, the market uses fluorocarbon free, Genestar Fireproof insulating panels.
Genestar Fireproof is a product that meets the conditions for curbing the use of goods that impact the environment in the environmental goods procurement policy established by the Tokyo Metropolitan government. They are used in areas all across Toyosu Market as insulating panels to aid in strict temperature control of fruits, vegetables, and marine products, and can be found in cold storage facilities, multi-level warehouses, processing, and packaging facilities.
In addition to low-temperature applications, our insulating panels are used in various business domains, with a solid track record in large-scale cleanroom products for the semiconductor industry and plans to support various other industries in the future.

Knowledge for Superior Earthquake-resistant Panels

Development of earthquake-resistant ceilings and individual booths

In the development process of a new earthquake-resistant ceiling inspired by lessons learned from the Great East Japan Earthquake, we created NEQRES, an ceiling that helps minimize damage due to falling ceilings during earthquakes.
It incorporates our knowledge on creating a disaster-resilient future, incorporating elements such as the earthquake-resistant ceiling braces used in server rooms. We provide safe spaces by testing earthquake resistance in everything from large spaces with special designated ceilings, to NOHEYA booths designed for individuals.

Initiatives to Improve Technical Abilities and Adaptability

Development and prototype testing at the Tec Lab engineering center

The Tec Lab engineering center is a core product research and development facility where the next generation of personnel are trained to help Nikkei Panel Systems make the leap from a panel manufacturer to a spatial engineering company.
We opened a production facilities room and development and testing room so that we could flexibly respond to product development and prototype testing challenges, where we are hard at work on improving researching and testing to meet the diverse needs of our customers.

Tec Lab engineering center concepts

  • Advance and accumulate core technologies with the future in mind
  • Expand our engineering functionality
  • Create an R&D environment that brings about new spaces and new value

Operational technology education at the Operational Dojo

Our operational technology department (aka: Operational Dojo) features a first and second floor well-style construction where we can assemble panels up to eight meters long.
This multipurpose facility allows us to verify installations at scale size, conduct training, and test and verify installation and construction methods.

Space Solutions